|
ID
|
09LME01
|
|
Also Known As
|
A-B1-09-FL
|
|
Abstract
|
United States Geological Survey, Florida Integrated Science
Center, Saint Petersburg (Terrestrial, Freshwater, and Marine
Ecosystems Program),United States Army Corps of
Engineers,National Park Service,Everglades National Park.
Chief Scientists: Tom Smith, Gordon Anderson, Karen
Balentine. Continuous monitoring of coastal hydrology wells
data of field activity 09LME01 (A-B1-09-FL) in Everglades
National Park, Florida, Ten Thousand Islands National
Wildlife Refuge from 10/01/2008 to 09/30/2009
|
|
Organization |
United States Geological Survey, Florida Integrated Science Center, Saint Petersburg (Terrestrial, Freshwater, and Marine Ecosystems Program)
United States Army Corps of Engineers
National Park Service
Everglades National Park
|
|
Project/Theme
|
Dynamics of Land Margin Ecosystems
|
|
Chief Scientist
|
Tom Smith
Gordon Anderson
Karen Balentine
|
|
Activity Type
|
Continuous monitoring of coastal hydrology wells
|
|
Platform
|
Air Boat
|
|
Area of Operation
|
Everglades National Park, Florida, Ten Thousand Islands National Wildlife Refuge, Florida
|
|
Bounding Coordinates
|
|
31.75000
|
|
-87.75000 -78.25000 |
|
23.75000 |
|
|
Ports
|
LEAVE Everglades NP
ARRIVE Everglades NP
|
|
Dates
|
10/01/2008 (JD 275) to 09/30/2009 (JD 273)
|
|
Analog Materials
|
No analog holdings.
|
|
Information Specialist
|
|
|
Purpose
|
Characterize the surface and groundwater hydrology in the coastal Everglades
|
|
|
Information to be Derived
|
Surface-water stage, temperature and conductivity;
Ground-water level, temperature and conductivity;
Depth and duration of wetland flooding
|
|
|
Summary
|
This task of the project collects continuous hydrological data from a network
of 16 sites along several drainages in the coastal Everglades. Sites vary from
freshwater wetlands (in headwater areas) to mangrove forests in downstream,
tidal regions.
|
|
|
Notes
|
T. Smith, G. Anderson, K. Balentine, G. Tiling and numerous international
interns / volunteers.
19' SeaCraft, 17' Parker, Airboat, Helicopter (ENP), Chevy Silverado (GSA lease)
This represents Task 9 of BASIS+ project 2090B6J
Version 2.1
|
|
|
Got Help?
|
For 09LME01, we would appreciate any information on -- analog materials, contract, crew, days at sea, dive count, equipment used, funding, kms of navigation, national plan, NGDC Info, owner, project number, publications, scanned materials, seismic description, station count, station description, submersible, tabulated info.
|
|
|