Coastal & Marine Geology InfoBank

Home FACS Activities Atlas Geology School Related Sites More

USGS CMG 2010-063-FA Metadata

Skip navigational links
Loading
Activities: by ID   by Platform   by Year   by Region   by Participant   by Organization   by Project/Theme   with Incomplete IDs   Disclaimer  
Activity First Letter: A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z   0   1   2   3   4   5   6   7   8   9  
Virtual Globes: Atlas  (GE)    Samples  (GE)    Moorings  (GE)    Illuminate Oceans  (GE)    Earthquakes  (GE)    Get GE    InfoBank examples    State Waters    Chronology  (GE)    Gravity Base Stations  (GE)
ID 2010-063-FA
Also Known As P-63-10-MA
2010-063-FA
Abstract United States Geological Survey, Woods Hole, Massachusetts. Chief Scientist: Mike Bothner. Sampling; data (Peristaltic pump) of field activity 2010-063-FA (P-63-10-MA) in Oyster Pond, Falmouth, Massachusetts, United States, North America from 07/20/2010 to 07/29/2010
Organization United States Geological Survey, Woods Hole, Massachusetts
Project/Theme Toxic Supp. of Biogeochem. Cycle
Chief Scientist Mike Bothner
Activity Type Sampling;
Platform On Foot
Area of Operation Oyster Pond, Falmouth, Massachusetts, United States, North America, Massachusetts
Bounding Coordinates
41.54764
-70.64490     -70.63471
41.53518
Ports LEAVE Ransom Road, Falmouth
ARRIVE Ransom Road, Falmouth
Dates 07/20/2010 (JD 201) to 07/29/2010 (JD 210)
Analog Materials No analog holdings.
Information Specialist
Mike Bothner
Crew
Mike Bothner Chief Scientist
Mike Casso
Kathleen Munson WHOI-MIT grad student
Equipment Used
Peristaltic pump
Purpose
Sample groundwater from 6 wells around the perimeter of Oyster Pond.
Determinations of the concentrations of mercury (in different chemical
forms),nutrients, dissolved orgainc C, Fe, and other constituents  will be
performed at a later date.  Profiling equipment will provide information
on temp, salinity, dissolved oxygen, Eh and pH.
Notes
Days at Sea: 8
 Project Maximum Weekly Overtime for Each: None
 Seven or More Days With No Port Call: No
 Major Center Equipment Required:
YSI-Type water column profiler
 Equipment Required from Other Sources:
Peristaltic pump supplied by WHOI
 Degree of Certainty: 100%
 If flow rates are satisfactory, the sampling work may only take 4 days to
 complete.
 Report Date: 2010-07-21
Project Number
2921-BOF7T
Funding
USGS Toxics Program
Got Help? For 2010-063-FA, we would appreciate any information on -- analog materials, contract, days at sea, dive count, information to be derived, kms of navigation, national plan, NGDC Info, owner, publications, scanned materials, seismic description, station count, station description, submersible, summary, tabulated info.
Type Webpage KMZ Arc         Metadata         WHSC
Metadata data     txt  data  FAQ  xml data
Navigation data nav      
Times   050.times      

2010-063-FA location map of where navigation 

equipment operated

 
Skip footer navigational links

Coastal and Marine Science Centers:  Pacific   St. Petersburg   Woods Hole  
InfoBank   Coastal and Marine Geology Program   Geologic Information   Ask-A-Geologist   USGS Disclaimer  


Accessibility FOIA Privacy Policies and Notices

Take Pride in America logo USA.gov logo U.S. Department of the Interior | U.S. Geological Survey
URL: http://walrus.wr.usgs.gov/infobank/p/p6310ma/html/p-63-10-ma.meta.html
Page Contact Information: InfoBank staff
Page Last Modified: Tue Oct 29 14:55:56 PDT 2013  (chd)